How New South Wales's grid-scale batteries performed in October 2026: energy and FCAS market revenue, $/MW, $/MWh, top performers, and price events.
New South Wales (NSW1) batteries earned $1.05M in estimated gross energy and FCAS market revenue so far in October 2026, from 16 grid-scale units tracked by NEMPulse. Figures cover October 2026 to date (through 7 Oct 2026).
Normalised across 3,159 MW and 8,784 MWh of registered capacity, the region earned $331/MW and $119/MWh for the period.
Total revenue was down 68% on the same days of September 2026, which returned $3.28M. Per MW per day — which strips out both fleet growth and the length of the window — earnings were down 69% at $47/MW/day. Optimal capture slipped 42 points, from 68% to 27%.
Energy arbitrage supplied 96% of the total and FCAS 2%, with estimated Frequency Performance Payments contributing the remaining 2% ($15k). Within FCAS, regulation accounted for 91% and contingency 9%; the single largest market was raise regulation at $13k.
For context on the trading conditions, the average daily price spread (top two hours minus bottom two hours) in New South Wales was $75/MWh, down 40% on the previous period, and the highest spot price reached $146/MWh.
Against the perfect-foresight energy benchmark, New South Wales batteries captured 27% of what hindsight would have earned, an estimated $2.71M of unrealised upside.
On capture of the perfect-foresight energy benchmark, the strongest performers were Limondale Battery (59%), New England BESS (47%), Darlington Point Energy Storage System (43%). At the other end: Orana BESS (25%), Wallgrove BESS 1 (18%), Waratah Super Battery (5%) — capture reflects strategy, contracting and constraints as much as skill, so a low figure is not automatically underperformance.
The strongest single day was 4 Oct 2026 at $335k, and the best single battery-day was Eraring Battery Energy Storage System on 4 Oct 2026 with $122k.
Eraring Battery Energy Storage System led the region with $348k. Full dispatch, state-of-charge and bidding detail is available on each battery's page.
| Battery | Energy + FCAS | $/MW | $/MWh | Capture |
|---|---|---|---|---|
| Eraring Battery Energy Storage System | $348k | $756/MW | $174/MWh | 38% |
| Liddell Battery Energy Storage System | $171k | $341/MW | $157/MWh | 26% |
| Orana BESS | $158k | $380/MW | $95/MWh | 25% |
| Limondale Battery | $142k | $2,838/MW | $265/MWh | 59% |
| Waratah Super Battery | $57k | $67/MW | $34/MWh | 5% |
| New England BESS | $46k | $463/MW | $184/MWh | 47% |
| Capital Battery | $41k | $408/MW | $204/MWh | 32% |
| Smithfield Battery Energy Storage System, Units 1 - 36 | $26k | $393/MW | $197/MWh | 26% |
| New England BESS | $26k | $255/MW | $101/MWh | 41% |
| Riverina Energy Storage System 1 | $23k | $391/MW | $195/MWh | 37% |
| Riverena Energy Storage System 2 | $20k | $305/MW | $152/MWh | 33% |
| Darlington Point Energy Storage System | $10k | $397/MW | $198/MWh | 43% |
Capture = actual energy revenue as a share of the perfect-foresight LP benchmark; shown only for units with material modelled upside.
Third-party reporting on these units, matched automatically and linked for context. NEMPulse does not endorse or verify external coverage.
Keep reading: Previous period: September 2026NEM-wide wrap — October 2026New South Wales battery fleetActual vs optimal dispatchMarket eventsHow capture is calculated
Explore: All insightsBattery fleetActual vs optimalPerformance rankingsMarket economicsMarket eventsBid stackBidding strategyVirtual power plantsProject simulatorAskPulseEmail alerts