Eraring Battery Energy Storage System (ERB01) is a 615 MW / 1997 MWh grid-scale battery energy storage system in New South Wales, tracked live on NEMPulse using AEMO 5-minute dispatch data. This page shows Eraring Battery Energy Storage System's energy arbitrage and FCAS revenue, state of charge, dispatch profile, bidding behaviour, and actual-vs-optimal performance in the Australian National Electricity Market (NEM).
With 1997 MWh of storage across 615 MW of power, Eraring Battery Energy Storage System is a 3.2-hour long-duration battery — the 3rd-largest of 18 grid-scale batteries in New South Wales by registered power, and one of the five largest in the NEM. Duration sets how long it can sustain full output, and with it how much of the daily price spread it can arbitrage before running flat.
As of 6 July 2026: estimated gross energy + FCAS market revenue month-to-date $310k; capturing 44.2% of optimal dispatch value.
Price and dispatch are measured AEMO values; energy and FCAS revenue are derived from them; FPP revenue and integrated state of charge are estimated. See the provenance scheme on the methodology page.
Explore: Battery fleetActual vs optimalPerformance rankingsMarket economicsMarket eventsBid stackBidding strategyVirtual power plantsProject simulatorAskPulseEmail alerts
Other New South Wales batteries: Waratah Super BatteryLiddell Battery Energy Storage SystemMortlake Battery Energy Storage SystemOrana BESSWilliamsdale BESSLimondale Battery
Loading live data…