NEMPulse · Insights · VIC1

Victoria Battery Wrap — H2 2026

How Victoria's grid-scale batteries performed in H2 2026: energy and FCAS market revenue, $/MW, $/MWh, top performers, and price events.

  • Energy + FCAS revenue: $35.73M
  • Batteries: 15
  • Rev / MW: $16k/MW
  • Rev / MWh: $7,545/MWh
  • Optimal capture: 56%
  • $/MW/day vs H1 2026: -6%

Victoria (VIC1) batteries earned $35.73M in estimated gross energy and FCAS market revenue so far in H2 2026, from 15 grid-scale units tracked by NEMPulse. Figures cover H2 2026 to date (through 13 Nov 2026).

Normalised across 2,260 MW and 4,736 MWh of registered capacity, the region earned $16k/MW and $7,545/MWh for the period.

Total revenue was up 31% on the same days of H1 2026, which returned $27.21M. Per MW per day — which strips out both fleet growth and the length of the window — earnings were down 6% at $116/MW/day. Optimal capture slipped 5 points, from 61% to 56%.

Energy arbitrage supplied 97% of the total and FCAS 2%, with estimated Frequency Performance Payments contributing the remaining 1% ($256k). Within FCAS, regulation accounted for 91% and contingency 9%; the single largest market was raise regulation at $536k.

For context on the trading conditions, the average daily price spread (top two hours minus bottom two hours) in Victoria was $137/MWh, up 16% on the previous period, and the highest spot price reached $19,070/MWh.

Against the perfect-foresight energy benchmark, Victoria batteries captured 56% of what hindsight would have earned, an estimated $27.07M of unrealised upside.

On capture of the perfect-foresight energy benchmark, the strongest performers were Terang BESS (69%), Melbourne Renewable Energy Hub Connection A3 (64%), Rangebank BESS (60%). At the other end: Ballarat Battery Energy Storage System (38%), Bulgana Green Power Hub (36%), Pine Lodge BESS (-4%) — capture reflects strategy, contracting and constraints as much as skill, so a low figure is not automatically underperformance.

The strongest single day was 8 Jul 2026 at $2.50M, and the best single battery-day was Rangebank BESS on 8 Jul 2026 with $675k. Revenue stays concentrated: five of the period's 136 days delivered 14% of everything Victoria batteries earned.

Melbourne Renewable Energy Hub Connection A3 led the region with $7.36M. Full dispatch, state-of-charge and bidding detail is available on each battery's page.

Victoria saw 12 price events this period, the sharpest an extreme price event peaking at $19,070/MWh.

Victoria batteries — H2 2026
BatteryEnergy + FCAS$/MW$/MWhCapture
Melbourne Renewable Energy Hub Connection A3$7.36M$37k/MW$9,195/MWh64%
Melbourne Renewable Energy Hub Connection A1$3.98M$20k/MW$9,942/MWh54%
Rangebank BESS$3.95M$20k/MW$9,880/MWh60%
Melbourne Renewable Energy Hub Connection A2$3.88M$19k/MW$9,689/MWh53%
Koorangie Energy Storage System$3.74M$20k/MW$10k/MWh59%
Victorian Big Battery$2.98M$9,937/MW$6,625/MWh44%
Mortlake Battery Energy Storage System$2.51M$8,358/MW$3,857/MWh52%
Latrobe Valley BESS$1.94M$19k/MW$9,716/MWh58%
Terang BESS$1.70M$17k/MW$8,520/MWh69%
Mornington BESS$1.56M$6,511/MW$2,649/MWh55%
Hazelwood Battery Energy Storage System$1.46M$9,749/MW$9,749/MWh52%
Bulgana Green Power Hub$250k$12k/MW$7,349/MWh36%

Capture = actual energy revenue as a share of the perfect-foresight LP benchmark; shown only for units with material modelled upside.

In the news this period
Valent’s 240-MW Mornington BESS in Victoria reaches full power
Renewables Now · 2 Oct 2026 · Mornington BESS
Victoria Battery Storage Milestones: Mornington BESS 240MW, Akaysha Elaine BESS Progress - News and Statistics
indexbox.io · 24 Sept 2026 · Mornington BESS
Big battery for big super: Aware to help keep Victoria’s lights on
AFR · 17 Sept 2026 · Victorian Big Battery
Victorian-First Big Battery To Power 200,000 Homes
The National Tribune · 16 Sept 2026 · Victorian Big Battery

Third-party reporting on these units, matched automatically and linked for context. NEMPulse does not endorse or verify external coverage.

Keep reading: Previous period: H1 2026NEM-wide wrap — H2 2026Victoria battery fleetActual vs optimal dispatchMarket eventsHow capture is calculated

Explore: All insightsBattery fleetActual vs optimalPerformance rankingsMarket economicsMarket eventsBid stackBidding strategyVirtual power plantsHome battery potential (modelled)Project simulatorAskPulseEmail alerts

Automatically generated from AEMO public data using fixed templates (not AI-written). Figures are estimated gross market revenue (energy + FCAS) from dispatch — they exclude contracts, hedges and network-support schemes (e.g. SIPS), so actual commercial revenue will differ.