NEMPulse · Battery

Ulinda Park BESS (ULPBESS1)

Ulinda Park BESS (ULPBESS1) is a 197 MW / 298 MWh grid-scale battery energy storage system in Queensland, tracked live on NEMPulse using AEMO 5-minute dispatch data. This page shows Ulinda Park BESS's energy arbitrage and FCAS revenue, state of charge, dispatch profile, bidding behaviour, and actual-vs-optimal performance in the Australian National Electricity Market (NEM).

With 298 MWh of storage across 197 MW of power, Ulinda Park BESS is a 1.5-hour medium-duration battery — the 12th-largest of 17 grid-scale batteries in Queensland by registered power. Duration sets how long it can sustain full output, and with it how much of the daily price spread it can arbitrage before running flat.

As of 6 July 2026: estimated gross energy + FCAS market revenue month-to-date $77k; capturing 58.8% of optimal dispatch value.

  • Region: Queensland (QLD1)
  • Power capacity: 197 MW
  • Energy capacity: 298 MWh
  • Duration: 1.5 h
  • FCAS markets: Registered
  • DUID: ULPBESS1

Price and dispatch are measured AEMO values; energy and FCAS revenue are derived from them; FPP revenue and integrated state of charge are estimated. See the provenance scheme on the methodology page.

Explore: Battery fleetActual vs optimalPerformance rankingsMarket economicsMarket eventsBid stackBidding strategyVirtual power plantsProject simulatorAskPulseEmail alerts

Other Queensland batteries: Tarong BESSSupernode BESSSupernode BESSSwanbank BESSStanwell Battery Energy Storage SystemWoolooga BESS

Loading live data…