Bolivar Waste Water Treatment Plant (BOWWBA1) is a 3 MW / 2 MWh grid-scale battery energy storage system in South Australia, tracked live on NEMPulse using AEMO 5-minute dispatch data. This page shows Bolivar Waste Water Treatment Plant's energy arbitrage and FCAS revenue, state of charge, dispatch profile, bidding behaviour, and actual-vs-optimal performance in the Australian National Electricity Market (NEM).
With 2 MWh of storage across 3 MW of power, Bolivar Waste Water Treatment Plant is a 0.7-hour short-duration battery — the 16th-largest of 17 grid-scale batteries in South Australia by registered power. Duration sets how long it can sustain full output, and with it how much of the daily price spread it can arbitrage before running flat.
As of 6 July 2026: estimated gross energy + FCAS market revenue month-to-date $388; capturing 37.1% of optimal dispatch value.
Price and dispatch are measured AEMO values; energy and FCAS revenue are derived from them; FPP revenue and integrated state of charge are estimated. See the provenance scheme on the methodology page.
Explore: Battery fleetActual vs optimalPerformance rankingsMarket economicsMarket eventsBid stackBidding strategyVirtual power plantsProject simulatorAskPulseEmail alerts
Other South Australia batteries: Blyth Battery Energy Storage SystemTorrens Island BESSBungama Battery Energy Storage SystemSummerfield BESS 1Summerfield BESS 2Hornsdale Power Reserve
Loading live data…